OUR PROCESS

Roof Replacment Process.jpg

STEP 1 (AGREEMENT & DEPOSIT) - STEP ONE IN YOUR ROOF REPLACEMENT PROCESS IS SIGNING YOUR PROPOSAL. YOUR ROOF PROPOSAL WILL CONTAIN ALL THE DETAILS PERTAINING TO YOUR PARTICULAR PROJECT. ONCE YOUR PROPOSAL HAS BEEN REVIEWED AND SIGNED OUR OFFICE STAFF WILL REACH OUT TO COLLECT A 50% DEPOSIT FOR YOUR PROJECT. PLEASE NOTE THAT THE DEPOSIT IS REQUIRED BEFORE YOUR PROJECT CAN MAKE IT INTO THE PERMITTING PROCESS.

 

STEP 2 (PERMITTING) - ONCE YOUR DEPOSIT HAS BEEN COLLECTED IT WILL ENTER OUR PERMITTING PROCESS. DEPENDING UPON YOUR CITY OR COUNTY'S REGULATIONS REQUIREMENTS FOR PERMITTING MAY VARY. ON AVERAGE IT TAKES 4-5 BUSINESS DAYS FOR PERMIT ISSUANCE. UPON PERMIT ISSUANCE A TENTATIVE START DATE WILL BE GENERATED, AND MATERIALS WILL BE COORDINATED FOR PICKUP/DELIVERY. 

 

STEP 3 (ROOF DEMO) - YOU'VE MADE IT! ROOF DEMO DAY IS HERE. AS MUCH AS WE WOULD LIKE TO DRESS UP THIS STEP IN THE PROJECT, AND PROMISE YOU A PERFECT DEMO DAY, WE CAN'T :(.  THE REALITY IS THAT YOUR HOME IS ABOUT TO BECOME A JOBSITE. LIKE MOST JOB SITES YOU CAN EXPECT LOUD NOISES, TRASH/DEBRIS, AND A WHOLE LOT OF MOVEMENT. PRIOR TO YOUR DEMO DAY, A DUMPSTER WILL BE SCHEDULED FOR DELIVERY.  PLEASE PLAN IN ADVANCE TO LOSE ACCESS TO YOUR GARAGE, AND USE OF THE DRIVEWAY FOR THE DURATION OF THE PROJECT. IT IS ALSO IMPORTANT TO USE CAUTION MOVING AROUND THE OUTSIDE OF YOUR HOME ON THE DAY YOUR DEMO IS BEING STARTED. THIS IS BECAUSE THE ROOF DEBRIS (INCLUDING NAILS), WILL BE DISCARDED FROM THE ROOF INTO THE DUMPSTER. THIS PROCESS CAN TAKE 1-3 DAYS DEPENDING UPON THE SIZE OF YOUR ROOF. PLEASE NOTE THAT ALL JOB SITES ARE CLEANED UP AT THE END OF THE WORKING DAY. WHILE THINGS MAY LOOK/GET MESSY IT IS IMPORTANT TO US THAT WE RETURN YOUR HOME TO YOU IN THE SAME CONDITION IN WHICH WE RECEIVED IT.

 

STEP 4 (DRY INSPECTION) - INSPECTION DAYS ARE EASY AND REQUIRE NO PREPARATION ON YOUR PART. THE DRY INSPECTION CONSISTS OF THE COUNTY INSPECTING OUR WORK TO ENSURE COMPLIANCE WITH LOCAL CODES AND BUILDING STATUTES. DEPENDING ON HOW LONG YOUR ROOF DEMO TAKES OUR OFFICE WILL SCHEDULE YOUR INSPECTION IN ADVANCE. HOWEVER, INSPECTION AVAILABILITY CAN VARY AND ARE OUTSIDE OF OUR CONTROL. 

 

STEP 5 (INSTALL ROOF COVERING - SHINGLE, TILE, OR METAL) - ONCE THE COUNTY SIGNS OFF ON YOUR INSPECTION YOUR ROOF HAS BEEN APPROVED TO MOVE FORWARD. STEP 5 IN OUR PROCESS CONSISTS OF INSTALLING THE FINAL ROOF COVERING. THIS COVERING WILL VARY DEPENDING ON YOUR SPECIFIC PROJECT DETAILS. NONETHELESS, THE INSTALL PROJECT IS NIGHT AND DAY COMPARED TO THE DEMO DAY (MUCH QUIETER, AND MUCH CLEANER WE PROMISE!). INSTALL DURATIONS WILL VARY DEPENDENT UPON THE COVERING SELECTED, AND THE SIZE OF YOUR ROOF. ONCE THE INSTALL IS COMPLETE A FINAL CLEANUP WILL BE PERFORMED. PLEASE NOTE WHILE TWO INSPECTIONS ARE TYPICAL SOME COUNTIES REQUIRE AN IN-PROGRESS INSPECTION. THIS INSPECTION JUST ENSURES OUR INSTALL METHOD IS APPROVED BY YOUR COUNTY AND ADHERES TO THE FLORIDA BUILDING CODE. IF THIS INSPECTION IS REQUIRED IN YOUR COUNTY YOUR SALES REPRESENTATIVE WILL INFORM YOU.

 

STEP 6 (FINAL INSPECTION) - THE MOMENT YOU HAVE BEEN WAITING FOR. THE FINAL INSTALL HAS BEEN COMPLETED, NOW THE COUNTY INSPECTOR SIGNS OFF ON OUR WORK, AND OUR SUPERVISORS QA YOUR ROOF!

 

STEP 7 (PAYMENT COLLECTION) - NOW THAT YOUR ROOF HAS BEEN COMPLETED AND THE JOB SITE IS TIDIED UP WE WILL REACH OUT TO YOU TO COLLECT THE FINAL PAYMENT. ALL LEIN RELEASES WILL BE PROVIDED AT THIS TIME.

 